Preliminary Design Program (PDP)

Arlington submitted the Preliminary Design Program to the Mass. School Building Authority (MSBA) on April 15, 2018.

The PDP is provided in two volumes due to large file size.  Some documents have security-related information redacted. Note: for convenience, some segments are provided as individual files.

Volume I (includes the following components)

Owner’s Project Manager’s Cover Letter
Acknowledgments

3.1.1 Introduction
3.1.2 Educational Program
3.1.3 Initial Space Summary
3.1.4 Evaluation of Existing Conditions
3.1.5 Site Development Requirements
3.1.6 Preliminary Evaluation of Alternatives
3.1.7 Local Actions and Approvals

Appendices

A. Statement of Interest
B. MSBA Board Action Letter
C. Executed Design Enrollment Certification
D. Capital Budget Statement
E. Project Directory
F. Updated Project Schedule
G. Educational Visioning Report
H. Educational Program
I. Initial Space Summary
J. Adjacency Diagram
K. Existing Conditions Floor Plans
L. Legal Title of Property
M. Project Notification Form
N. Evaluation of Existing Conditions

Volume II (includes the following components)

O. Phase I Environmental Site Assessment Report
P. Phase II Site Investigation – Vapor Intrusion Pathway
Q. Hazardous Material Identification Study
R. Existing Non-Conforming Spaces
S. Existing Site Plan and Site Use Diagrams
T. Existing Building Construction by Date Diagram
U. Renovation Only Floor Plans
V. Preliminary Evaluation of Alternatives
W. Other Potential Sites (Map of Alternate Sites, Alternate Site Analysis (with massing blocks), Alternate Site Analysis Matrix)
X. Selected Alternatives
Y. Comparative Cost Analysis
Z. Local Actions and Approval Letters and Minutes

Upcoming Events

Recent News

Minuteman Bikeway connection construction

Dec. 11-13, 2024 AHS Bikeway Ramp Connection Work  Connection will open at the completion of Phase 4, Summer 2025  Beginning Wednesday, December 11th, construction activity will take place on the Minuteman Bikeway, adjacent to Arlington High School (AHS) where the...

Phase 3 Schedule Update

Phase 3 construction of the new high school is currently underway. This phase includes construction of the Athletic wing with a 16,000 square foot gymnasium and two alternate Physical Education spaces, a Black Box theater for performing arts classes and an outdoor...

Virtual Tour of Phase 2 Spaces

Phase 2 of the new high school opened to students in November 2023. Principal Matthew Janger gives a virtual tour of the Phase 2 spaces including the Student Center, Library, Cafeteria, Forum Stairs and Humanities wing. AHS Phase 2 Virtual Tour - January 2024 from...

Phase 2 is Open!

The new Humanities wing and Student Center opened on November 8. Additional parts of Phase 2 include the district administration offices and Menotomy Preschool (which will open to students in early 2024). Communication: Press Release Superintendent's Update Message...