Preferred Schematic Report (PSR)

Arlington submitted the Preferred Schematic Report to the Mass. School Building Authority (MSBA) on July 1, 2018.  This document is currently in draft form and under review by the MSBA.

The PSR is provided in three volumes due to large file size.  Some documents have security-related information redacted. Note: for convenience, some segments are provided as individual files.

Volume I (includes the following components)

Acknowledgments

3.3.1 Introduction
3.3.2 Evaluation of Existing Conditions
3.3.3 Evaluation of Alternatives
3.3.4 Preferred Solution
3.3.5 Local Actions and Approvals

Appendices

A. PDP MSBA Review Comments and District Response
B. Site Survey
C. GeoTechnical Report
D. Massachusetts Historic Commission Response Letter
E. Conceptual Drawings

Alternative 2: Renovations and Additions
Alternative 5B : Renovations and Additions
Alternative 6A: New Construction
Alternative 7: New Construction

Volume II (includes the following components)

F. Structural Outline
G. Civil Narrative
H. MEP/FP and Technology/AV/Security Narratives
I. Construction Cost Estimates

Base Repair
Renovation Only
Addition+Renovation and New Construction

J. Design and Construction Schedules
K. Summary of Preliminary Design Pricing
L. Evaluation Matrices

Town Forum Survey – April
Town Forum Survey – June
Guiding Principles Evaluation Chart and Graphic
Sustainability Evaluation
AHSBC Pros and Cons

Volume III (includes the following components)

M. Updated Educational Program
N. Preferred Solution Space Summary
O. ‘Other’ Proposed Program Space Narrative
P. Sustainability Documents

LEED Scorecard
Signed Letter

Q. Preferred Solution Floor Plans, Sections, and Models (and construction timeline)
R. Preferred Solution Site Plan
S. Preferred Solution Budget Statement
T. Updated Project Schedule
U. Local Actions and Approvals

Upcoming Events

Recent News

Phase 3 Photo Gallery

This photo gallery gives you an inside look at the new AHS Athletics wing and other Phase 3 spaces. Click on any image to view a slideshow.

Phase 3 is Open!

With the opening of Phase 3, construction of new high school buildings is completed. Only a short final phase of site work will follow. The new Athletics wing and Black Box Theater opened on February 24. Additional parts of Phase 3 include an outdoor amphitheater,...

Phase 4 Site Impacts

Phase 4, the final phase of the Arlington High School Building project, includes construction of two additional synthetic turf multi-sport fields and a Minuteman Bikeway connector. This final phase is anticipated to be completed by September 2025.

Virtual Tour of Phase 2 Spaces

Phase 2 of the new high school opened to students in November 2023. Principal Matthew Janger gives a virtual tour of the Phase 2 spaces including the Student Center, Library, Cafeteria, Forum Stairs and Humanities wing. AHS Phase 2 Virtual Tour - January 2024 from...

Phase 2 is Open!

The new Humanities wing and Student Center opened on November 8. Additional parts of Phase 2 include the district administration offices and Menotomy Preschool (which will open to students in early 2024). Communication: Press Release Superintendent's Update Message...

Connect with us

Sign up to receive updates