Preferred Schematic Report (PSR)

Arlington submitted the Preferred Schematic Report to the Mass. School Building Authority (MSBA) on July 1, 2018.  This document is currently in draft form and under review by the MSBA.

The PSR is provided in three volumes due to large file size.  Some documents have security-related information redacted. Note: for convenience, some segments are provided as individual files.

Volume I (includes the following components)

Acknowledgments

3.3.1 Introduction
3.3.2 Evaluation of Existing Conditions
3.3.3 Evaluation of Alternatives
3.3.4 Preferred Solution
3.3.5 Local Actions and Approvals

Appendices

A. PDP MSBA Review Comments and District Response
B. Site Survey
C. GeoTechnical Report
D. Massachusetts Historic Commission Response Letter
E. Conceptual Drawings

Alternative 2: Renovations and Additions
Alternative 5B : Renovations and Additions
Alternative 6A: New Construction
Alternative 7: New Construction

Volume II (includes the following components)

F. Structural Outline
G. Civil Narrative
H. MEP/FP and Technology/AV/Security Narratives
I. Construction Cost Estimates

Base Repair
Renovation Only
Addition+Renovation and New Construction

J. Design and Construction Schedules
K. Summary of Preliminary Design Pricing
L. Evaluation Matrices

Town Forum Survey – April
Town Forum Survey – June
Guiding Principles Evaluation Chart and Graphic
Sustainability Evaluation
AHSBC Pros and Cons

Volume III (includes the following components)

M. Updated Educational Program
N. Preferred Solution Space Summary
O. ‘Other’ Proposed Program Space Narrative
P. Sustainability Documents

LEED Scorecard
Signed Letter

Q. Preferred Solution Floor Plans, Sections, and Models (and construction timeline)
R. Preferred Solution Site Plan
S. Preferred Solution Budget Statement
T. Updated Project Schedule
U. Local Actions and Approvals

Upcoming Events

Recent News

Minuteman Bikeway connection construction

Dec. 11-13, 2024 AHS Bikeway Ramp Connection Work  Connection will open at the completion of Phase 4, Summer 2025  Beginning Wednesday, December 11th, construction activity will take place on the Minuteman Bikeway, adjacent to Arlington High School (AHS) where the...

Phase 3 Schedule Update

Phase 3 construction of the new high school is currently underway. This phase includes construction of the Athletic wing with a 16,000 square foot gymnasium and two alternate Physical Education spaces, a Black Box theater for performing arts classes and an outdoor...

Virtual Tour of Phase 2 Spaces

Phase 2 of the new high school opened to students in November 2023. Principal Matthew Janger gives a virtual tour of the Phase 2 spaces including the Student Center, Library, Cafeteria, Forum Stairs and Humanities wing. AHS Phase 2 Virtual Tour - January 2024 from...

Phase 2 is Open!

The new Humanities wing and Student Center opened on November 8. Additional parts of Phase 2 include the district administration offices and Menotomy Preschool (which will open to students in early 2024). Communication: Press Release Superintendent's Update Message...

Connect with us

Sign up to receive updates