5 Documents 5 Mass. School Building Authority 5 60% Construction Documents

60% Construction Documents

Arlington submitted the 60% Construction Documents to the Mass. School Building Authority (MSBA) in May 2020.

The 60% Construction Documents Submission is provided in 3 volumes due to the large file size.  Some documents have security-related information redacted. 

Binder Volume I of III

Cover Letter

Acknowledgments

1 Introduction

Summary of Design Development

Certified Committee Vote for approval of 60% Submission

Certified Committee Vote for 60% Submission Proprietary Items

2 OPM Deliverables

2.1. Submittal Review and Coordination

2.1.A OPM Written Design Submission Review 

2.1.B Design Coordination 

OPM Design Review Log

Phasing & Logistics Plans 

2.1.C Commissioning Consultant Review 

2.1.D District Response to the MSBA Comments of Design Development Submission 

2.2 Project Schedule

OPM Master Schedule 

Consgili Construction Company – AHS Construction Schedule 

Consgili Construction Company – Parmenter Schedule

AHSBC State Approvals Letter 

2.3 Project Scope and Budget 

2.3.A Project Scope & Budget Summary

OPM Cost Estimate Reconciliation Form

2.3.B 60% CD Estimate Package  

2.3.C Total Project Budget (3011)

2.3.D Early Bid Packages 

2.3.E Value Management Log

Binder Volume II of III

3 Designer Deliverable

3.1 General Requirements

3.1.1 Updated Work Plan

3.1.2 Basis of Design Narrative

Civil

Landscape

Architectural

Structural

HVAC

Electrical

Plumbing 

Fire Protection

Technology/AV/Security

3.1.3 Building Code Analysis

3.1.4 Proprietary Items 

3.1.5 Interior Color Theory

3.1.6 Updated LEED Scorecard

3.1.7 Structural Calculations

3.1.8 Structural Peer Review Status

Binder Volume III of III

3.1 General Requirements CONTINUED

3.1.9 Energy Calculations

3.1.10 Life Cycle Cost Analysis

3.1.11 Heat Gain and Loss Calculations

3.1.12 Calculations Including Total Electrical Load

3.1.13 Security and Visual Access Requirements

3.1.14 Facility and Maintenance Requirements

3.1.15 Quality Control Documents

3.2 Space Summary

3.2.1 Update Space Summary & Signed Certification

3.2.2 Comparison of Current Design w Final Education Program

3.2.3 DESE Response

3.3 Project Approvals

Project Approvals Status

Confirmation of Approvals

List and Target Dates for Local Approvals

Utilities

3.4 Cost Estimate

Upcoming Events

Recent News

Welcome Back Students!

As the new school year gets underway, the following resources will help students, parents and community members access the high school during Phase 3 construction.

Arlington is victim of cybercrime

A Message from Jeff Thielman, Chair of the AHS Building Committee  Arlington Town Manager Jim Feeney announced today that the Town of Arlington and the AHS Building Project were recently victims of cybercrime. I would like to thank Mr. Feeney and the Town for their...

Phase 3 Schedule Update

Phase 3 construction of the new high school is currently underway. This phase includes construction of the Athletic wing with a 16,000 square foot gymnasium and two alternate Physical Education spaces, a Black Box theater for performing arts classes and an outdoor...

Virtual Tour of Phase 2 Spaces

Phase 2 of the new high school opened to students in November 2023. Principal Matthew Janger gives a virtual tour of the Phase 2 spaces including the Student Center, Library, Cafeteria, Forum Stairs and Humanities wing. AHS Phase 2 Virtual Tour - January 2024 from...

Phase 2 is Open!

The new Humanities wing and Student Center opened on November 8. Additional parts of Phase 2 include the district administration offices and Menotomy Preschool (which will open to students in early 2024). Communication: Press Release Superintendent's Update Message...

Blog: Phase 3 Preview

Phase 3 construction of the new high school began immediately after the opening of Phase 2 and is anticipated to be complete by February 2025. During this last phase of construction, the athletics wing, outdoor amphitheater, and black box theater will be built. Read...

Connect with us

Sign up to receive updates