The project team was busy over winter break moving the library and cafeteria to their temporary homes during Phase 2 of construction. The library moved to Old Hall and the cafeteria to the Blue Gym. The Pit will be used as overflow cafeteria space as well as the new location for ‘Old Hall’ study halls. These changes will remain in place until Phase 2 construction is complete in the fall of 2023.
Phase 2 Preparation
January 21, 2022Recent News
Connect with us
Sign up to receive updates