5 Blog Post 5 Ventilation and air filtration in the new school

Ventilation and air filtration in the new school

January 21, 2021

In light of this past year’s events, the AHS Building Committee directed the Project Design Team to take steps to increase indoor air quality and airborne virus mitigation strategies within the new high school HVAC system design. In December 2020, the Building Committee approved a revised HVAC system design that will be included in the project. The new school’s HVAC system design includes increased filtration (MERV-13) and central air handling systems (MERV-14), a space level bi-polar air purification system and an increased Indoor Air Quality (IAQ) setting in the HVAC Control System.   

HVAC System Design

Filter efficiency varies greatly depending on the type and size of the desired particles to be captured. The COVID-19 virus is most commonly embedded in larger particles in the 1 µm to 5 µm size range. At this size, a very high percentage of particles will be captured by MERV-13/14 filters. 

In addition, the new high school’s Air Purification System will aid in capturing airborne viruses by releasing ions into spaces within the building. Positively charged ions will attach to and deactivate particles in the air, dropping them from the breathing zone or increasing their size to be large enough to be captured by the MERV-rated filters.  

HVAC Control System

Part and parcel to filtration and air purification, the HVAC Control System will be provided with an Increased IAQ setting (Pandemic Mode as referred to by governing bodies). When activated, this setting will:

  1. extend air handling system operating hours to flush the building’s air during unoccupied times
  2. increase the quantity of outdoor air in the building
  3. modify building/space pressure relationships to mitigate air transmission between regularly occupied group spaces.

AHS Today

The school district realizes that air quality is important in the current high school as well and has taken steps to ensure that all of the HVAC systems have been restored to full function. Existing filtration has been upgraded to MERV13, and fresh-air intake has been increased. Classroom spaces will also be outfitted with portable HEPA air cleaning machines.

While there is no way to completely eliminate the spread of airborne viruses within buildings, the AHS Building Committee believes that the measures that will be implemented into the new school offer a suitable approach.   

Upcoming Events

Recent News

Welcome Back Students!

As the new school year gets underway, the following resources will help students, parents and community members access the high school during Phase 3 construction.

Arlington is victim of cybercrime

A Message from Jeff Thielman, Chair of the AHS Building Committee  Arlington Town Manager Jim Feeney announced today that the Town of Arlington and the AHS Building Project were recently victims of cybercrime. I would like to thank Mr. Feeney and the Town for their...

Phase 3 Schedule Update

Phase 3 construction of the new high school is currently underway. This phase includes construction of the Athletic wing with a 16,000 square foot gymnasium and two alternate Physical Education spaces, a Black Box theater for performing arts classes and an outdoor...

Virtual Tour of Phase 2 Spaces

Phase 2 of the new high school opened to students in November 2023. Principal Matthew Janger gives a virtual tour of the Phase 2 spaces including the Student Center, Library, Cafeteria, Forum Stairs and Humanities wing. AHS Phase 2 Virtual Tour - January 2024 from...

Phase 2 is Open!

The new Humanities wing and Student Center opened on November 8. Additional parts of Phase 2 include the district administration offices and Menotomy Preschool (which will open to students in early 2024). Communication: Press Release Superintendent's Update Message...

Blog: Phase 3 Preview

Phase 3 construction of the new high school began immediately after the opening of Phase 2 and is anticipated to be complete by February 2025. During this last phase of construction, the athletics wing, outdoor amphitheater, and black box theater will be built. Read...

Connect with us

Sign up to receive updates