This is a repository of miscellaneous documents from the building project. Refer to the Mass. School Building Authority page for official submissions.
Presentations & Drawings
AHS Phase 3 Traffic Plan, August 2024
AHS Construction Phasing Diagram, March 2024
AHS Phase 3 Traffic Plan, January 2024
Fall 2023 Traffic/Arrival Map, November 2023
Construction Phasing Diagram, November 2023
Fall 2023 Traffic/Arrival Map, August 2023
Construction Phasing Diagram, October 2022
AHS Construction Timeline and Grade Comparison, October 2022
Fall 2022 Traffic/Arrival Map, August 2022
Project Update: Opening of New Wings & What’s Next #2(Forum Presentation), January 2022
Project Update: Opening of New Wings & What’s Next (Forum Presentation), December 2021
Abutter Meeting presentation and replay, December 2021
Winter/Spring 2022 Traffic/Arrival Map, November 2021
AHS Construction Timeline and Grade Comparison, September 2021
Fall/Winter 2021 Traffic/Arrival Map, August 2021
Construction Phasing Diagram, April 2021
AHS Construction Timeline and Grade Comparison, September 2020
Construction Update: Site work begins soon (Forum Presentation), February 2020
Project Update: Site work begins soon (Forum Presentation), February 2020
Construction Site Maps, February 2020
Project Update (Forum Presentation), October 2019
AHS Construction Timeline and Grade Comparison, October 2019
HMFH Design Update, October 2019
HMFH Design Update, September 2019
Construction Phasing Diagram, September 2019
HMFH Design Update, August 2019
Abutters Meeting Presentation, July 2019
Consigli Overview Presentation (Construction Manager), June 2019
Project Update (Forum Presentation), May 2019
Town Meeting – Report, Presentation, ACMi replay, April 2019
Presentation to Select Board, April 2019
Open Space Overview, Feb. 2019
HMFH Design Update, Feb. 2019
HMFH Exterior Facade Update, Jan. 2019
Community Forum – Project Update and Costs, Jan. 2019
HMFH Project Update, Jan. 2019
HMFH Design Update, Dec. 2018
Construction Manager at Risk Overview, Dec. 2018
HMFH Exterior Facade Update, Dec. 2018
Schematic Design Update (exterior facade, site plan, and more), Nov. 2018
Community Forum – Project Overview and Update , Nov. 2018
HMFH Design Concept Update (floor plans, exterior concepts), Nov. 2018
HMFH Design Concept Update (historic element reuse, central spine), Nov. 2018
HMFH Initial Exterior Design Concepts, Oct. 2018
HMFH Front Green Update, Oct. 2018
Community Forum – Project, Design, Cost Updates, Sept. 2018
Preferred Design Concept Images, June 2018
Preferred Design Concept Preliminary Construction Phasing, June 2018
AHS Space Summary (updated), June 2018
Updated Design Concepts (HMFH Presentation), June 2018
AHS Preferred Design Alternatives, May 2018
Preliminary Evaluation of Alternatives (excerpt from Preliminary Design Program), April 2018
Original 8 Preliminary Design Alternatives, April 2018
Reports
Monthly Indoor Air Quality Assessments
LEED Energy Model Report (100% Construction Documents), January 2021
Lead Paint Sampling Reports – June 2020
Report to Town Meeting, April 2019
LEED Scoresheet (Schematic Design), February 2019
HMFH Parmenter School Cost/Space Analysis, January 2019
Schematic Design Feedback Form Summary, December 2018
Traffic Impact Analysis Report and Appendices, August 2018
Geotechnical Preliminary Foundation Engineering Report, June 2018
June Feedback Form Data Summary, June 2018
Evaluation of Existing Conditions Report, March 2018 (Final, Redacted)
McKibben Forecast for APS Enrollment, August 2016
8 Year Enrollment History and Projected Enrollment 2014 to 2028 – by Grade Levels, February 2014
Arlington High School Analysis of Programmatic Needs, February 2014
On-Site Insight Report on Arlington High School, August 2013
Arlington High School NEASC Letter, June 2013
Arlington High School NEASC Report, December 2012
Communication
Student Quick Guide, August 2024
Phase 3 FAQ, August 2024
Student Quick Guide, August 2023
Phase 2 FAQ, August 2023
Student Quick Guide, January 2022
Phase 1/Phase 2 Transition FAQ, December 2021
Student Quick Guide, August 2021
Student Quick Guide, September 2020
Project Overview, September 2019
Project Overview, April 2019
School Committee Value Engineering letter to AHS Building Committee, Jan. 2019
School Committee letter to AHS Building Committee, January 2019
A message from the AHS Building Committee Chair: Moving forward together, September 2018
AHS Building Committee Leadership Editorial: The AHS Project – Progress Made and Decisions Ahead, September 2018
Environmental & Sustainability
LEED Scoresheet (submitted with 90% Construction Documents), August 2020
Accelerate Perform Program Targets, Nov. 2018
Preliminary Sustainability Evaluation Matrix, June 2018
Cost & Finances
Tax Impact – Updated, phased, May 2019
MSBA Project Benchmarks (Schematic Design) – updated, May 2019
Tax Impact – Updated, April 2019
MSBA Project Benchmarks (Schematic Design), April 2019
Total Project Budget Details (MSBA 3011 sheet), April 2019
Value Engineering (final vote), Feb. 5, 2019
Value Engineering (straw poll), Jan. 31, 2019
MSBA Project Benchmarks (PSR), Jan. 2019
Tax Impact Update, Jan. 2019
Value Engineering DRAFT, Dec. 2018
AHS Cost Factor Table, Sept. 2018
Preferred Design Concept Cost Summary and Tax Impact, August 2018
AHS Alternatives Cost Comparison Summary and Tax Impact, July 2018
AHS Preliminary Design Option Pricing (from PSR), July 2018
Alternatives Cost Comparison Summary, June 2018
MSBA High School Project Benchmarks, June 2018
Benchmark Cost Estimate Summary, April 2018
Education-Related Documents
Guiding Principles Evaluation Evaluation Chart and Supporting Diagrams, June 2018
AHS Educational Program (updated), June 2018 (Redacted)
Adjacency Diagram, March 2018
Educational Visioning Report, March 29, 2018 (Redacted)
Request for Proposals
Request for Designer Services August 2017
Request for Owner’s Project Manager Services April 2017