Detailed Design

Arlington submitted the Detailed Design to the Mass. School Building Authority (MSBA) in January 2020.

The Design Development Submission is provided in 4 volumes due to the large file size.  Some documents have security-related information redacted. 

Volume 1

Cover Letter

      Acknowledgments

1    Introduction

– Summary of Design Development

2    OPM Deliverables

2.1   Submittal Review and Coordination

2.2   Project Schedule

2.3   Scope and Budget

– Cost Estimate Comparison

– Total Project Budget (3011)

– Value Management Log

– Certified Committee Vote for Value Management

Volume 2

3    Designer Deliverable

3.1 General Requirements

3.1.1      Updated Work Plan

3.1.2      Basis of Design Narrative

3.1.2a        Basis of Design – Civil

3.1.2b        Basis of Design – Landscape

3.1.2c        Basis of Design – Geotechnical

3.1.2e        Basis of Design – Architectural

3.1.2f         Basis of Design – Acoustical

3.1.2g        Basis of Design – Furniture & Equipment

3.1.2h        Basis of Design – HVAC, Electrical, Plumbing & Fire Protection

3.1.2i         Basis of Design – Lighting

3.1.2j         Basis of Design – Technology and Security

3.1.2k        Basis of Design – Geothermal

3.1.2l         Basis of Design – Solar Photovoltaic

3.1.3      Building Code Analysis

3.1.4      Proprietary Items

3.1.5      Interior Color Theory

3.1.6      Confirmation of Project Registration

Volume 3

3.1 General Requirements CONTINUED

3.1.7      Structural Narrative

3.1.8      Structural Calculations

3.1.9      Energy Calculations

3.1.10    Life Cycle Cost Analysis

3.1.11    Heat Gain and Loss Calculations

3.1.12    Calculations Including Total Electrical Load

3.1.13    Security and Visual Access Requirements

3.1.14    Quality Control Documents

3.2 Space Summary

3.2.1      Update Space Summary & Signed Certification

3.2.2      Comparison of Current Design w Final Education Program

3.2.3      DESE Submittal – SEE BINDER VOLUME IV

3.3 Project Approvals

3.4 Cost Estimate

Volume 4

3.2.3     DESE Submittal

3.2.3a        OPM Cover Letter

3.2.3b        School Delivery Methodology Letter (unchanged?)

3.2.3c        Space Summary

3.2.3d        Educational Summary Narrative (unchanged?)

3.2.3e        DESE Floor Plans

3.2.3f         Adjacency Table


Recent News

Photo Gallery

View a complete overview of the new school in this comprehensive photo gallery.

AHS Completion Celebration

On October 25, 2025 the Town of Arlington officially celebrated the completion of the new Arlington High School with a morning ribbon cutting ceremony and afternoon Community Open House.  We appreciate the support from our local and state officials, the Arlington...

Project Milestones & Statistics

As we celebrate the completion of the new Arlington High School, we reflect on the overall project. These milestones and statistics represent over nine years of work by the AHS Building Committee and project partners. Click on any image to expand.

Phase 4 Photo Gallery

This photo gallery highlights the final features of the newly completed high school. Click on any image to view a slideshow.

AHS LEED Case Study

Integrating sustainability into the new high school was a collaborative process from the very beginning. The design team worked with building users to address site energy and water use with sustainability in mind. The new school's design helps Arlington make...