5 Phases 5 Phases: Feasibility

Phases: Feasibility

The Feasibility Phase of the Arlington High School Building Project began in February 2017 and is anticipated to last 16-20 months.  The Feasibility Phase includes the following milestones:

  • Forming the Project Team
  • Hiring an Owner’s Project Manager
  • Selecting a Designer
  • Conducting a Feasibility Study

During the Feasibility Study, the Arlington High School Building Committee and Arlington district/school staff work with the MSBA to document Arlington High School’s educational program, generate an initial space summary, document existing conditions, establish design parameters, develop and evaluate alternatives, and recommend the most cost effective and educationally appropriate preferred solution to the MSBA Board of Directors for their consideration.

During this phase, the Arlington’s Owner’s Project Manager will submit, on behalf of the Arlington District and our designer, a Preliminary Design Program and a Preferred Schematic Report. Approval by the MSBA Board of Directors is required for the project to proceed into Schematic Design.

Design Concept Information:

Documents:

Costs/Financial

Ponderings Blog Posts:

MSBA

Upcoming Events

Recent News

Welcome Back Students!

As the new school year gets underway, the following resources will help students, parents and community members access the high school during Phase 3 construction.

Arlington is victim of cybercrime

A Message from Jeff Thielman, Chair of the AHS Building Committee  Arlington Town Manager Jim Feeney announced today that the Town of Arlington and the AHS Building Project were recently victims of cybercrime. I would like to thank Mr. Feeney and the Town for their...

Phase 3 Schedule Update

Phase 3 construction of the new high school is currently underway. This phase includes construction of the Athletic wing with a 16,000 square foot gymnasium and two alternate Physical Education spaces, a Black Box theater for performing arts classes and an outdoor...

Virtual Tour of Phase 2 Spaces

Phase 2 of the new high school opened to students in November 2023. Principal Matthew Janger gives a virtual tour of the Phase 2 spaces including the Student Center, Library, Cafeteria, Forum Stairs and Humanities wing. AHS Phase 2 Virtual Tour - January 2024 from...

Phase 2 is Open!

The new Humanities wing and Student Center opened on November 8. Additional parts of Phase 2 include the district administration offices and Menotomy Preschool (which will open to students in early 2024). Communication: Press Release Superintendent's Update Message...

Blog: Phase 3 Preview

Phase 3 construction of the new high school began immediately after the opening of Phase 2 and is anticipated to be complete by February 2025. During this last phase of construction, the athletics wing, outdoor amphitheater, and black box theater will be built. Read...