Preferred Schematic Report (PSR)

Arlington submitted the Preferred Schematic Report to the Mass. School Building Authority (MSBA) on July 1, 2018.  This document is currently in draft form and under review by the MSBA.

The PSR is provided in three volumes due to large file size.  Some documents have security-related information redacted. Note: for convenience, some segments are provided as individual files.

Volume I (includes the following components)

Acknowledgments

3.3.1 Introduction
3.3.2 Evaluation of Existing Conditions
3.3.3 Evaluation of Alternatives
3.3.4 Preferred Solution
3.3.5 Local Actions and Approvals

Appendices

A. PDP MSBA Review Comments and District Response
B. Site Survey
C. GeoTechnical Report
D. Massachusetts Historic Commission Response Letter
E. Conceptual Drawings

Alternative 2: Renovations and Additions
Alternative 5B : Renovations and Additions
Alternative 6A: New Construction
Alternative 7: New Construction

Volume II (includes the following components)

F. Structural Outline
G. Civil Narrative
H. MEP/FP and Technology/AV/Security Narratives
I. Construction Cost Estimates

Base Repair
Renovation Only
Addition+Renovation and New Construction

J. Design and Construction Schedules
K. Summary of Preliminary Design Pricing
L. Evaluation Matrices

Town Forum Survey – April
Town Forum Survey – June
Guiding Principles Evaluation Chart and Graphic
Sustainability Evaluation
AHSBC Pros and Cons

Volume III (includes the following components)

M. Updated Educational Program
N. Preferred Solution Space Summary
O. ‘Other’ Proposed Program Space Narrative
P. Sustainability Documents

LEED Scorecard
Signed Letter

Q. Preferred Solution Floor Plans, Sections, and Models (and construction timeline)
R. Preferred Solution Site Plan
S. Preferred Solution Budget Statement
T. Updated Project Schedule
U. Local Actions and Approvals

Recent News

Photo Gallery

View a complete overview of the new school in this comprehensive photo gallery.

AHS Completion Celebration

On October 25, 2025 the Town of Arlington officially celebrated the completion of the new Arlington High School with a morning ribbon cutting ceremony and afternoon Community Open House.  We appreciate the support from our local and state officials, the Arlington...

Project Milestones & Statistics

As we celebrate the completion of the new Arlington High School, we reflect on the overall project. These milestones and statistics represent over nine years of work by the AHS Building Committee and project partners. Click on any image to expand.

Phase 4 Photo Gallery

This photo gallery highlights the final features of the newly completed high school. Click on any image to view a slideshow.

AHS LEED Case Study

Integrating sustainability into the new high school was a collaborative process from the very beginning. The design team worked with building users to address site energy and water use with sustainability in mind. The new school's design helps Arlington make...